The project question
What needed to be resolved
The technical record had to connect baseline soil and marine-water information with clean-fill suitability and the condition of shoreline, intertidal and shallow-water areas.
Our approach
From evidence to a reviewable output
- Reviewed available baseline soil and marine-water evidence.
- Assessed the suitability information for clean fill used in the rehabilitation works.
- Checked contractor completion records and photographs against the documented rehabilitation method.
- Prepared the environmental close-out report and an inspection request for authority review.
Documented outputs
What ESAC delivered
- Final environmental rehabilitation completion and verification report Rev. 5
- Baseline soil and marine-water evidence review
- Clean-fill suitability review
- Documentary/visual review of contractor completion evidence
- Request for authority inspection
Assignment status
What the record shows
ESAC prepared a final environmental rehabilitation completion and verification report in September 2026. Authority review, inspection and written closure were still pending in the records reviewed. The contractor carried out the physical works.