A waterfront extension required a seawall design that connected marine loading, ground conditions, construction materials and the existing edge.

← ESAC Water projects
Concrete waterfront edge and public promenade
SectorWaterfront and marine infrastructure
ESAC's roleMarine design consultant to the contractor
Documented stageDesign report and signed design confirmation; later review comments

The project question

How should the new seawall meet the existing edge?

The design had to account for the seabed profile, ground capacity, water levels and vessel-generated waves while maintaining a workable connection to existing marine infrastructure.

Our approach

Connect the inputs to the design checks

  1. Reviewed available bathymetric and geotechnical information.
  2. Established design water levels and the applicable marine loading cases.
  3. Checked wall stability, bearing and settlement for the proposed seawall section.
  4. Documented the design basis, materials and construction interface for review.

Documented outputs

A reviewable marine design package

  • Detailed seawall design report
  • Signed ESAC marine design confirmation
  • Supporting design calculations and coordination records

Assignment status

What the records show

The ESAC design report and signed confirmation establish its design role. A subsequent reviewer response was satisfactory on basic information but raised material criteria and further approval conditions. The available records do not establish final authority approval or construction completion.