Selected ESAC assignment · Dubai, UAE
Stormwater pond slope protection review in Dubai
A tender-stage stormwater pond package needed a technical comparison between the specified slope protection and a proposed HDPE geocell alternative.
← All projectsThe project question
Could a different slope-protection build-up meet the design intent?
The proposal replaced the specified rock-filled mattress with a layered system of selected material, geotextile and stone-filled HDPE geocell above the pond liner. The review needed to address slope stability, erosion protection, the required cover over the liner and restraint details without penetrating it.
Our approach
Compare the systems and identify decision gates
- Reviewed the reference drawings, specification, product data and proposed layer sequence.
- Checked global and near-surface slope stability using GEO5 and supporting calculations.
- Examined liner cover, anchorage, rapid drawdown and interfaces at inlets and outfalls.
- Recorded the testing, product specifications and construction conditions needed before acceptance.
Documented outputs
A decision-ready technical review
- ESAC technical review report, Revision 02
- Slope-stability analysis and a preliminary section drawing
- Comparison of the specified and proposed protection systems
- Conditions for interface testing, material confirmation and construction detailing
Assignment status
What the records establish
The report is a tender-stage assessment. It conditionally accepts the proposed build-up as a technical option, while recording product-data gaps and testing that must be resolved. The section drawing is preliminary and marked not for construction. The records do not establish client or authority approval, installation, or field performance.