Landfill & containment engineering

Develop disposal infrastructure around containment and long-term performance.

Explore our approach

Waste & Circularity

Landfill & containment engineering

Develop disposal infrastructure around containment and long-term performance. Define waste and site conditions; design liners, leachate collection and gas arrangements; assess stability and construction interfaces. Containment is assessed as a connected system, where ground response, drainage and construction quality influence long-term performance. Design documentation makes those interfaces explicit and sets out the assumptions, material requirements and checks needed to carry the selected solution into procurement and construction planning.

Define waste and site conditions; design liners, leachate collection and gas arrangements; assess stability and construction interfaces.

Service in practice

From information to decisions.

Develop disposal infrastructure around containment and long-term performance.

Context scene for Landfill & containment engineering

Project inputs

  • Waste characteristics and filling programme
  • Ground investigation and groundwater data

Technical work

  • Set the containment design basis
  • Develop system arrangements
  • Check geotechnical performance
  • Prepare construction information

Your outputs

  • Design basis
  • Calculations and drawings
  • Technical specifications

Workflow overview. Detailed methods, review stages and deliverables follow the agreed project scope.

From scope to delivery

Our approach.

  1. Set the containment design basis

    Review waste characteristics, site geology, groundwater, geometry and the intended operating sequence.

  2. Develop system arrangements

    Coordinate liners, leachate drainage, gas collection and surface-water management within the proposed cell layout.

  3. Check geotechnical performance

    Assess relevant stability, settlement and interface behaviour for construction, operation and closure conditions.

  4. Prepare construction information

    Document calculations, drawings and material requirements, identifying quality checks and interfaces needing specialist input.

What you receive

Outputs for your next decision.

Deliverables and the level of detail are agreed for your assignment.

Construction quality assurance, laboratory testing and site supervision require a defined appointment and inspection programme.

Tools & methods

Analysis that fits the assessment.

The methods and specialist software are selected around the question, available information and agreed scope. Assumptions and limitations remain part of the technical record.

GeoStudio / PLAXIS

Assess landfill slope stability and soil–structure interaction.

GIS / AutoCAD

Support facility layouts, catchment mapping and coordinated drawings.

Getting started

Bring the information you have.

We will review the available evidence and define the work needed to address your project question.

Discuss your project