Building energy modelling

Compare the performance implications of design choices before construction.

Explore our approach

Green Building & Energy

Building energy modelling

Compare the performance implications of design choices before construction. Establish modelling assumptions, build baseline and proposed scenarios and test envelope, systems, schedules and efficiency measures. The model provides a consistent comparison of alternatives and shows which assumptions influence predicted consumption. Results support coordination between architecture and building systems, with a transparent account of schedules, weather and operating inputs so the team can interpret performance differences and refine the design.

Establish modelling assumptions, build baseline and proposed scenarios and test envelope, systems, schedules and efficiency measures.

Service in practice

From information to decisions.

Compare the performance implications of design choices before construction.

Context scene for Building energy modelling

Project inputs

  • Architectural geometry and envelope specifications
  • HVAC and lighting design information

Technical work

  • Agree the modelling basis
  • Build and check the model
  • Test design alternatives
  • Document findings and evidence

Your outputs

  • Energy model
  • Options report
  • Compliance evidence

Workflow overview. Detailed methods, review stages and deliverables follow the agreed project scope.

From scope to delivery

Our approach.

  1. Agree the modelling basis

    Define the assessment purpose, geometry, weather, schedules and baseline or comparison requirements.

  2. Build and check the model

    Represent the envelope, occupancy, lighting and building systems and review inputs for consistency.

  3. Test design alternatives

    Compare relevant envelope and system measures, examining sensitivity to assumptions that materially affect results.

  4. Document findings and evidence

    Explain predicted performance, design implications and modelling limitations in the required report or compliance package.

What you receive

Outputs for your next decision.

Deliverables and the level of detail are agreed for your assignment.

Predicted performance is scenario-based; actual consumption depends on construction, commissioning, occupancy and operating conditions.

Tools & methods

Analysis that fits the assessment.

The methods and specialist software are selected around the question, available information and agreed scope. Assumptions and limitations remain part of the technical record.

EnergyPlus / DesignBuilder / IES VE

Support whole-building energy analysis and design-option comparison.

Revit / Navisworks

Coordinate building information and review design interfaces.

Excel / Power BI

Organise consumption, measure appraisal and portfolio reporting.

Getting started

Bring the information you have.

We will review the available evidence and define the work needed to address your project question.

Discuss your project